Data loggers and energy audits for solar
Before we design anything, we log your site’s real electricity use for about a week. Your solar, inverter and battery sizes then come from facts, not guesses.
- 5.0 on Google
- 100+ installations
- Sigenergy installer awards, 2024 & 2026

Your electricity bill doesn’t tell the whole story
A monthly bill shows a total. It doesn’t show when you use power, how high your peaks go or what runs at night. Those details decide what size system you need and how quickly it pays for itself.
Too big costs money
An oversized system means paying for panels and batteries that produce energy you can’t use or export, which stretches the payback.
Too small disappoints
An undersized inverter trips when motors, pumps or compressors start, and a small battery runs flat before the grid comes back.
Timing changes the savings
On time-of-use tariffs, a kilowatt-hour in the evening peak costs far more than one at midday. Knowing your load curve shows where solar and batteries save the most.
Demand charges add up
Many businesses and farms pay for their highest kVA peak as well as their kWh. Logging shows what causes those peaks and whether a battery can shave them.
Grid rules set limits
Grid-tied systems must fit your connection size and the NRS 097 rules your municipality or Eskom applies. Real data makes the registration application straightforward.
Backup must cover what matters
During grid outages you need to know exactly which loads the battery must carry and for how long. Logging measures that instead of estimating it.

Every peak, every hour, for a full week
A professional power logger is clamped onto the incoming supply at your main distribution board. It records your site’s electricity use around the clock, weekdays and weekends, so the design reflects how you actually work.
- kVA instant peaks: the highest load your site draws, including motor and pump start-ups
- Base load: what keeps running at night and over weekends
- Total kWh, and how much is used in daylight compared with at night
- Load per phase, so the system can be balanced across a three-phase supply
- Voltage, power factor and harmonics at the point of connection
What the analysis tells us
Once the logger comes off, our engineers turn a week of readings into the numbers that decide your system.
Solar array size
How many kWp of panels your daytime load can use, so you aren’t paying for energy you can’t use.
Inverter size
An inverter that handles your real peaks and start-up surges, with headroom where it’s needed.
Battery size
Storage for night-time use, peak shaving and backup during grid outages, each sized from your load curve.
Savings and payback
A realistic savings estimate based on your tariff, which feeds the payback figure in your proposal.
The live data logging page lists the main items we analyse: kVA instant peaks, kVA base loads, total kWh, kWh used during the day versus at night, batteries for night-time use, and batteries for peak shaving and backup.
Tell us about your site and we’ll arrange a logger and a proposal built on your real usage.

One week of data
Twenty-five years of the right system
From booking to proposal
Logging is the first practical step in every Orilla Solar business and farm project, and in larger homes and farmhouses.

Book a date
We agree a suitable date and time with you, and ask for a recent electricity bill and your tariff.

Install the logger
Our team installs the logger safely at your main distribution board. Your power stays on.

Log for about a week
The logger records your use for about seven days, covering a normal working week and a weekend.

Remove and download
We collect the logger and download the data for analysis.

Analyse and design
Our engineers study your load profile and design the system around it.

Proposal and quote
You receive a detailed proposal and quotation showing system size, savings and payback, with the reasoning behind each number.
Our data logging work
Real photos of Orilla Solar engineers and electricians logging client sites.



Every site where size and payback matter

Factories, warehouses and offices
Demand charges, time-of-use tariffs and three-phase loads make logging essential.
Commercial solar page
Pumps, cold rooms and packsheds
Big motor start-ups and seasonal loads need careful sizing. We log the points that matter on your farm.
Farm solar page
Pools, workshops and home offices
Where the load is large or unusual, a week of logging gets the battery and backup right.
Home solar pageTariffs are rising and getting more complex
NERSA approved an average Eskom increase of 8.76% for direct customers from 1 April 2026 and 9.01% for municipalities from 1 July 2026. Many commercial and farm tariffs also charge for peak demand and price energy by time of day and season.
- Time-of-use: peak, standard and off-peak rates, with higher prices in the winter high-demand season
- Demand charges: billed on your highest kVA in the month
- Fixed and network charges that solar can’t remove, so savings must be modelled honestly
Grid connection and registration
A grid-tied system must be registered with your municipality or Eskom as small-scale embedded generation (SSEG) and meet the NRS 097-2 standards. These limit system size and export relative to your connection, so your logged demand and supply size matter from the start.
- System sized within your connection and the utility’s limits
- Certificate of Compliance from our Installation Electrician
- SSEG application handled for you. We also make existing systems compliant

Designed by engineers who read the data themselves
Orilla Solar is led by Wouter Zonnestein, an engineer who studied at Stellenbosch University. Our engineers analyse every logging report in-house and design the system from it. No outsourced guesswork.
- Installation Electrician on staff and a CoC on every installation
- Health and safety file for every project
- Public liability and project insurance
- PV GreenCard accredited
installations completed by Orilla Solar
rating on Google from our clients
Recognised by Sigenergy with installer awards in 2024 and 2026
Gauteng and the surrounding provinces
Our teams log sites anywhere in Gauteng plus Limpopo, North West, Mpumalanga and the Free State.
- Gauteng
- Limpopo
- North West
- Mpumalanga
- Free State
Data logging questions, answered
What happens on site, how long it takes and what you get.
Start with the data
Tell us about your site and send a recent electricity bill. We’ll book a logging date and design a system around how you actually use power.